Completed Project: Challney Girls School, Luton - Wates Construction

Construction of 2 Natural pitches, 4 court MUGA and full size floodlit Synthetic Hockey Pitch

Works commenced on site at the end of July with an expected 14 week construction programme. The design incorporated the synthetic pitches as part of the overall site attenuation system for the new school site and was constructed over a 450mm piped linear soak-away and a 600mm stone raft. The works were completed within a nine week period exceeding all expectations, resulting in early handover of the sports facilities to the school and a football match between "A-power" and the "Wates Allstars."

Tony Mulcahy, project manager for Wates commented: "To be honest I was very impressed.  Agripower showed great commitment on site and men or machinery were never an issue. They also know their business on MUGA’s and AWP’s, provide a good level of technical back up  and  a decent design capability. To top it off they finished the project early. Would I use them again? No problem!"

Agripower are all extremely proud of the project at Challney and would like to thank our own staff and those at Wates who have worked together to create a fantastic facility for the school.

Project Started: 27th July 2009
Project Completed: 25th September 2009
Project Value: £650,000

 

Email: info@agripower.co.uk Tel: 01494 866776

                               
Agripower - Natural Sports Turf Surfaces - Artificial Turf Sports Pitches - Artificial Turf / Synthetic Turf Surface Options
Water Engineering - Equestrian - Turf Laying - Sports Turf & Pitch Drainage - Natural Sports Turf Renovations
Artificial Turf Renovation - Environmental Works - Civil Engineering - Sportsturf
Land Drainage - Synthetic grass - Artificial grass - Sports pitch construction
Land survey - Drain CCTV - Sand banding - Sand slitting - Drainage
Golf course construction - Irrigation reservoir - Pitch Design and build
Website hosted by Fusion Media