Completed Project: Nottingham County Council

Situated within an open park area, the Garden Lane project consisted of a full size 3G pitch to FA community use specification. The project commenced in March 2009 with the installation of a full drainage system, stone sub-base and edgings. Twin bar fencing to a height of 4.5mts was installed to the pitch perimeter and made provision for 8 goal recesses allowing I full pitch and 3 cross pitches.

The playing surface was a 60mm monofilament sand and rubber infill system from Tiger Turf with inlaid lines. Other site works included a complete floodlighting system, perimeter mowing strip, access ramp for traffic and pedestrian use, Detox area and extensive earthworks and landscaping.

Working through some continued poor weather conditions, Agripower still kept the project to programme and budget, producing a top class facility for the local community and schools to enjoy.

Project Started: March 2009
Project Completed: May 2009

Email: info@agripower.co.uk Tel: 01494 866776

                               
Agripower - Natural Sports Turf Surfaces - Artificial Turf Sports Pitches - Artificial Turf / Synthetic Turf Surface Options
Water Engineering - Equestrian - Turf Laying - Sports Turf & Pitch Drainage - Natural Sports Turf Renovations
Artificial Turf Renovation - Environmental Works - Civil Engineering - Sportsturf
Land Drainage - Synthetic grass - Artificial grass - Sports pitch construction
Land survey - Drain CCTV - Sand banding - Sand slitting - Drainage
Golf course construction - Irrigation reservoir - Pitch Design and build
Website hosted by Fusion Media