Sand Banding, Sand Slitting
Sand banding should be installed in conjunction with the primary piped drainage system to remove surface water quickly and efficiently from the playing surface to the drains below.
This technique enables maximum usage of the turf to be achieved during periods of inclement weather. Spacings are variable, depending on the sporting activity, soil type or financial constraints.
Sand band trenches are excavated 50mm wide to a maximum depth of 400mm, using our specialist disc trenchers, equipped with side elevators to carry away the excavated soil. The narrow trench width reduces the amount of backfilling material required, keeping costs to a minimum.
Sand band trenches are backfilled using hydraulically operated two-stage hoppers, which deliver an even layer of gravel followed by sand, compressed as it is installed to reduce settlement.
Normal play can be resumed immediately.
Sand Placement
In addition to drainage and sand banding, or on a maintenance basis, sand placement and sand grooving operations are ideally suited for areas where heavy rise is envisaged and requiring the maximum drainage potential.
Equipped with oscillating blades, the Sand Placement machine injects sand or ‘Lytag’to a depth of 225mm at 1metre centres. The vibrating action helps to break up surface compaction and provide a connection to underground installations.
Sand Grooving
The Sand Groover provides an intensive series of surface drains at 200mm centres to a depth of 100mm. This is particularly useful in areas which receive heavy usage or where surface capping has reduced drainage capacity.
|