Case Study:

The Brunts School, Mansfield

The Brunts School, Mansfield

An old sand filled surface was lifted and recycled using Agripower's carpet lifting machine, the sand removed from the grass was used to improve the adjacent school fields drainage. This meant less material having to be removed from site and also giving the client added value. The existing shock pad was retained, only possible because of the grass lifting machine pioneered by Agripower, the only one of its kind in the world! As a result of consultation with the school, it was agreed that the proposed system would be a 40mm 3G surface that met both the performance requirements of IFIA and FIH. The Project was completed within 3 weeks, on time and on budget.

Project details:

Duration: 3 Weeks